The proposed facility, located at Rua das Albizias, aims to address Macao’s limited land availability through a high-density, multi-storey architecture. By employing Brightray’s FPD fully prefabricated technology, the developers intend to shift over 90% of construction and system integration into a factory-controlled environment. This method is projected to increase construction efficiency by more than 30% compared to traditional on-site building, while reducing noise, dust, and safety risks.
Designed to meet Tier III standards, the 9,000-square-meter campus will support versatile IT deployments, including air-cooled, liquid-cooled, and hybrid configurations. The facility is expected to maintain an average power usage effectiveness (PUE) below 1.35 at full load. According to Brightray founder Bin Wang, the project serves as a demonstration for industrialized construction in space-constrained urban environments, potentially bolstering Macao’s digital economy and AI research capabilities.

Comments (0)
No comments yet. Be the first!